Rough Carpentry

Our rough carpentry division is where it all started. We have been the go to commercial framer in Northern California for over 25 years.

Our in-house training program results in a workforce that is well equipped to face the challenges and demands of today’s jobsite, while performing our work safely and with the best quality in the business.

Our team has a wide range of experience covering

  • Multi-Family
  • Industrial
  • Medical Office Building
  • High End Custom Residential
  • Mixed Use
  • Retrofit

Experience:

  • Retail
  • Commercial
  • Resort
  • Hotel
  • Service Stations
HALO Medical & Dental – Sacramento, CA

HALO Medical & Dental is a new 14,484 square foot building in North Sacramento. The new facility will be operated by a nonprofit health care provider, and will offer primary care and family medicine.

ST. IGNATIUS – Sacramento, CA
construction site
B St Theatre – Sacramento, CA

With two state-of-the-art stages, this project is a 48,000-square-foot complex at 27th St and Capital Avenue.

Fairway One Pebble Beach – Pebble Beach, CA

The Fairway One at Pebble Beach project was the construction of their new 7,200 sf Lodge, and Five new guestroom buildings for a total of (40) rooms. This project is located on the First Fairway of the World Famous Pebble Beach Golf Course.

An image of a houses on a lawn
An image of houses being constructed
An image of a building being constructed
Ice Block 1 – Ascent- Sacramento, CA

Ice Block 1 is a 4 story mixed use building totaling approx. 131,000 SF with 1 level of underground parking. With its unique all wood structural design, this project is one of the West Coasts most iconic projects. We performed the Structural Steel and Rough Carpentry scopes of work.

construction site
construction site
Ice Block 2 – Davis Reed – Sacramento, CA

The project is composed of three structures. The North Building is type V-A construction and consists of 3-levels of apartments (52 units) over a ground level of retail. The southern building is type III-A construction over type I-A podium consisting of 5-levels of apartments (90 units) over at grade parking spaces. At the podium level there is a swimming pool and resident amenities. The West building is type V-B Construction and consists of 2-levels of restaurant shell space. We performed the Rough Carpentry and Structural Steel scopes of work.

An image of a building being constructed
An image of a building being constructed
Ice Block 2 Rendering
Welk B – SMC Contracting – Truckee, CA

Welk Resorts Northstar Building B is a four story wood framed building containing 71 luxury units. We performed the Rough Carpentry and Structural Steel scopes of work.

An image of a building being constructed
construction site
construction site
Welk C – SMC Contracting – Truckee, CA

Welk resorts Northstar Building C is a four story building consisting of 69,000 SF of luxury timeshare units. We performed the Rough Carpentry, Structural Steel, and Metal Stud/Drywall scopes of work.

An image of a building being constructed
An image of a building being constructed
construction site
Zalanta – SMC Contracting – South Lake Tahoe, CA

Zalanta Resort at the Village’ is a whole ownership luxury condominium development situated in the heart of South Lake Tahoe. The 75,000 SF building has below ground parking, Ground floor retail and 2 additional levels containing 30 condo units.

An image of a building being constructed
An image of a building being constructed
An image of a building being constructed
William Jessup University Phase II – Reeve-Knight – Rocklin, CA
An image of a building being constructed
An image of a building being constructed
Marriott Shadow Ridge – SMC Contracting – Palm Desert, CA
An image of a building being constructed
construction site
construction site
Sac Foods Co-Op – West Fork Construction – Sacramento, CA
An image of a building being constructed
sac co-op building
construction site
Express Fuel – Gettler-Ryan – Shingle Springs, CA
An image of a building being constructed
construction site
construction site
Sporthaus Sugar Bowl – SMC Contracting – Norden, CA
An image of a building being constructed
St. Marys – Jackson Construction – Sacramento, CA
A street view of a church
construction site
construction site
URC – A.P. Thomas Construction – Davis, CA
An image of a building being constructed
An image of a building being constructed