Metal Stud / Drywall

Our Metal Stud and Drywall division was launched in 2004 to provide a complete framing package from a wood shell building to a completely built out tenant improvement.

Our dedicated MSD department has the skills and knowledge to complete any type of job including

  • High Rise Multi-Family
  • Distribution Centers
  • Medical Office Buildings
  • Schools
  • Retail
  • And everything else in between!

Experience:

19J SACRAMENTO – DAVIS REED CONSTRUCTION, INC.

The project features 173 innovatively designed, residential rental units above 7,000 square feet of ground floor retail. The “small and smart” studio design addresses the critical need for more affordable units tailored toward the young workforce in the heart of the central city. 19J provides several communal spaces for its residents to enjoy including: outdoor/indoor patios and lounges, fitness centers, a sky terrace overlooking the downtown skyline, and a 1,500 square foot rooftop garden.

19j rendering
HALO MEDICAL & DENTAL – SACRAMENTO, CA

HALO Medical & Dental is a new 14,484 square foot building in North Sacramento. The new facility will be operated by a nonprofit health care provider, and will offer primary care and family medicine.

ST. IGNATIUS – Hilbers, Inc. – ROSEVILLE, CA

 

Project Metro – Amazon – Big- D Construction Corp. – Sacramento, CA

Project Metro is an 855,000 SF Distribution facility occupied by Amazon near Sacramento International Airport.

An image of a building being constructed
An image of a building being constructed
An image of a building being constructed
Thunder Valley – Flint Builders- Lincoln, CA

The Thunder Valley Hotel Expansion & Renovation project was a three phased project which were completed simultaneously and concurrently. These phases consist of the re-skinning of the Hotel Tower, the build-out of Levels 3, 5, & 6 of the Hotel Tower, and the renovation of Levels 7-17 of the Hotel Tower.

An image of the side of a building
Century Towers – Barry Swenson Builder – San Jose, CA

The Century Center Towers project consisted of (2) high-rise 12 story towers with 376 units, and two levels of above ground parking.

An image of a building being constructed
An image of a building being constructed
Welk C – SMC Contracting – Truckee, CA
An image of a building being constructed
An image of a building being constructed
An image of a building being constructed
Main and Marshall – ZCon Builders – Redwood City, CA
An image of a building being constructed
An image of a building being constructed
URC – A.P. Thomas Construction – Davis, CA
An image of a building being constructed
An image of a building being constructed
Casino M8trix – South Bay Construction – San Jose, CA
An image of a building being constructed
An image of a casino interior
Skyport Marriott – Barry Swenson Builder – San Jose, CA
An image of a building being constructed